Number of items: 1.
Subtransmission line cost reduction through optimised design, 132 kV Wellington-Dubbo case study
Couch, P.
(2013)
Subtransmission line cost reduction through optimised design, 132 kV Wellington-Dubbo case study.
[USQ Project]
This list was generated on Sun Dec 22 02:49:17 2024 AEST.