Number of items: 1.
Subtransmission line cost reduction through optimised design, 132 kV Wellington-Dubbo case study
Couch, P.
(2013)
Subtransmission line cost reduction through optimised design, 132 kV Wellington-Dubbo case study.
[USQ Project]
This list was generated on Thu Aug 7 22:51:19 2025 AEST.