Browse by Fields of Research (ANZSRC 2008)

Up a level
Export as [feed] RSS 1.0 [feed] RSS 2.0
Number of items at this level: 84.

Blades, Tyson (2017) Fatal crashes at T-junctions within New South Wales. [USQ Project]

Freeman, Belinda (2016) Future public transport options for Toowoomba for the next twenty years. [USQ Project]

West, Jared (2015) Transitioning roadways from high-speed to low-speed environments when approaching regional towns in North Queensland. [USQ Project]

Stager, Martin Franz (2014) The impact of compact urban form on the provision of public road transport. [USQ Project]

Boully, Jacinda (2014) An analysis of human behaviour which can cause fatalities in the bus and train tunnel during a tunnel fire event. [USQ Project]

O'Callaghan, Adam (2014) An analysis of roadbase materials used in foamed bitumen stabilisation. [USQ Project]

Dudman, Benjamin (2014) Aquaplaning assessment and mitigation in flat terrains. [USQ Project]

Single, John H. (2014) Cost effective pavement reconstruction or rehabilitation profile(s) in Townsville. [USQ Project]

McKenzie, Seren (2014) Development of a road safety plan for Scenic Rim Regional Council. [USQ Project]

Sanders, Thomas (2014) Effective road pavement rehabilitation design for local government roads within the Sunshine Coast region. [USQ Project]

Wilton, Joshua (2014) Foam bitumen stabilisation in north west NSW. [USQ Project]

Newman, Matthew (2014) High speed rail in Australia: a case study for a Sydney- Wollongong link. [USQ Project]

Stanton, Vernon (2014) Investigation of the effect of positive and negative crossfalls on road safety at roundabouts. [USQ Project]

Holzner, Katherine (2014) Rigid central safety barriers in constrained road environment. [USQ Project]

Franks, Chris (2014) Safety and efficiency benefits of implementing zip merge treatments in NSW. [USQ Project]

Power, Scott (2014) The affect of lighting interchange ramps on safety – a study of the M1. [USQ Project]

King, Bernie-Anne (2014) The effect of road roughness on traffic speed and road safety. [USQ Project]

Miller, Nadya (2014) The impact of a new light rail network upon walkability in a central business district. [USQ Project]

Freeman, Bryan (2013) A preliminary feasibility study for transporting Surat Basin export coal using Maglev technology. [USQ Project]

Kirjan, Jeremy Nicholas (2013) Use of wire extensometers for monitoring pavement performance in areas of slope instability. [USQ Project]

Bowles, Yvonne Elizabeth (2013) A consistent approach to headlight screens in NSW. [USQ Project]

Reynolds, Peter William (2013) Engineering correlations for the characterisation of reactive soil behaviour for use in road design. [USQ Project]

Dann, William (2013) Investigation into traffic controller health and safety at road works in Queensland. [USQ Project]

Langes, Chris (2013) Investigation of shunt vehicle derailments. [USQ Project]

Hartwig, Andrew (2013) Management of low traffic volume roads unsealed road classification system. [USQ Project]

Spilsbury-Brinkmann, Casey (2013) The economic feasibility of upgrading Moree’s light industrial area to legally cater for restricted access vehicles. [USQ Project]

Spurling, Harrison (2013) Water sensitive urban design for sustainable road development. [USQ Project]

Smith, Scott David (2012) Determination of a strategic planning approach for maintenance management of a major road network. [USQ Project]

Taylor, Jarrod Lee (2012) Evaluation of the capacity of signalised two lane roundabouts. [USQ Project]

Whittaker, Adam (2012) The safety benefit of continuous narrow painted median strips. [USQ Project]

Olm, David William Charles (2011) Management of road reconstruction and repair following a flooding disaster. [USQ Project]

Fichera, Anthony (2011) A practical comparison of VISSIM and SIDRA for the assessment of development impacts. [USQ Project]

Randall, Neil William (2011) A preliminary analysis of the effectiveness of the new QLD GDL program. [USQ Project]

Keleher, Matthew (2011) Analysis of high-speed rural traffic crashes within the South-West district of Toowoomba regional council. [USQ Project]

Wilson, Paul (2011) Effectiveness of lime stabilisation on reactive soils for main roads. [USQ Project]

Zeller, Karl (2011) Evaluation of the operational characteristics of heavy vehicles at signalised intersections in Queensland. [USQ Project]

Meredith, Tyronne (2011) Options for the replacement of aging bridges under local authority control in rural areas of Queensland. [USQ Project]

Yin, Matthew (2011) Using local gravel sources and granular stabilisation for the production of pavement gravels in the Toowoomba region. [USQ Project]

Fitzgerald, Danial (2011) Managing the repair of transport infrastructure after a natural disaster. [USQ Project]

Stanton, Dale John (2010) Atterberg limits and their relationship to longitudinal cracking in granular pavements. [USQ Project]

Martin, Joseph A. (2010) Driving problems encountered in the UAE by newly arrived expatriates and tourists. [USQ Project]

Caunce, Catherine May (2010) Effective road pavement design for expansive soils in Ipswich. [USQ Project]

Hanson, Scott (2010) Improvement and performance of pavement gravels used by Toowoomba Regional Council for unsealed roads. [USQ Project]

Zanetti, Ashley (2010) Investigation of pavement design for low volume rural roads. [USQ Project]

Langdon, Aaron G. (2009) Traffic induced moisture entry into road pavements. [USQ Project]

Crone, Jeffrey John (2009) Alternate pavement types on reactive soils in the Ipswich Council area. [USQ Project]

Porter, Hannah Elizabeth (2009) Involvement of older drivers at crashes at unsignalised and signalised intersections. [USQ Project]

Armstrong, Andrew Jonathan (2009) Sealing works performance study. [USQ Project]

Baker, Philip James (2009) The 50 kph speed limit in residential Toowoomba. [USQ Project]

Shann, Blaise N. (2008) Variable rate bitumen spraying in road construction and resurfacing. [USQ Project]

Taylor, Timothy Noel (2008) Rural arterial road operating speed assessment. [USQ Project]

Goodall, Joshua Edward Allan (2008) The effect of the 50km/h implementation on local streets in Toowoomba. [USQ Project]

Adams, Nicholas John (2008) The pedestrianisation of inner city Toowoomba. [USQ Project]

Ole, Zayne Kristian (2008) Track stability and buckling - rail stress management. [USQ Project]

O'May, David Victor (2007) A study of pavement performance on the Gatton Bypass Duplication. [USQ Project]

Gallagher, Tony (2007) Clear zones in urban environments. [USQ Project]

Weis, Paul Raymond (2007) Cost effectiveness of street lighting. [USQ Project]

Liyanawaduge, Nawanandana Chandrasiri (2007) GPS usage and infrastructure needs for machine guidance and control in the construction projects associated with QDMR. [USQ Project]

Crowe, Daniel Leigh (2007) Management of physical assets at Purga Quarry. [USQ Project]

Dugdell, David Thomas (2007) Toowoomba road network review. [USQ Project]

Harvey, Warren John (2007) Bridge approach guardrail prioritisation. [USQ Project]

Johnston, George Finlay (2007) Wildlife vehicle collision GIS mapping & modelling. [USQ Project]

Weatherley, Mark Geoffrey (2007) The effect of compaction on the design life of rehabilitated insitu cement powder stabilised pavements. [USQ Project]

Sharp, Clayton Anthony (2006) Investigation of Toowoomba intersection crashes. [USQ Project]

Hughes, Neil (2006) Accuracy of volumes from MX(moss) design software. [USQ Project]

Govender, Gansen (2006) Driver fatigue issues on State Highway 1 south of Whangarei - within region 1 of New Zealand. [USQ Project]

Bartlett, Jeremy Adam (2006) Establishment of a priority infrastructure plan for the major road network in Laidley Shire. [USQ Project]

Tierney, Daniel Robert (2006) Freight transport following an extreme rainfall event. [USQ Project]

Allen, Glen Keith (2006) Problems of stone mastic asphalt use in north Queensland. [USQ Project]

Luke, Ricky (2006) Cost effectiveness of suburban street lighting. [USQ Project]

Tucker, Neil John (2006) Evaluation of the Queensland streets concept in residential streets in Logan City. [USQ Project]

Kannapiran, Ram Kumar M. (2005) A study and evaluation on SMART Project, Malaysia. [USQ Project]

Harber, Paul James (2005) Applicability of no-fines concrete as a road pavement. [USQ Project]

Outschoorn, Jeremy Paul (2005) Computational fluid mechanics investigation of ventilation aboard a livestock vessel. [USQ Project]

Domrow, Ryan (2005) Development of a mechanical testing system to investigate road deformation. [USQ Project]

Anderson, Troy Dennis (2005) Prioritisation of guard rail remediation works. [USQ Project]

Wong, Alan (2005) Using GIS to explore the relationship between road grade and accidents. [USQ Project]

Leong, Weng Wah (2005) The impact of trenching on urban road operation and maintenance. [USQ Project]

Mackenzie, Christopher Frank (2004) Evaluation of funding justification of low volume roads in North Queensland. [USQ Project]

Jensen, Jason W. (2004) Influence of physical road characteristics on road crashes. [USQ Project]

Li, David (2004) Investigation of driver fatigue problems on the Oakey-Cooyar road. [USQ Project]

Underhill, Richard (2004) Life cycle maintenance of low volume roads in the Alice Springs region. [USQ Project]

Tan, Kok Wei (2004) Motorcycle safety in Malaysia. [USQ Project]

Gitau, Samuel Kimani (2004) Use of road asset maintenance planning software in QDMR. [USQ Project]

This list was generated on Thu Nov 21 20:34:40 2024 AEST.