Up a level |
Mccullagh, Harry James (2016) An investigation of the predictive accuracy of salinity forecast using the source IMS for the Murray-Darling river. [USQ Project]
Rusconi, Luke (2016) Analysis of steady state vs dynamic modelling of groundwater mounding in development areas in WA. [USQ Project]
Priest, Andrew James (2016) Development of stormwater asset management plan for local council. [USQ Project]
Cuell, Jonathan (2016) Effects of on-site detention systems on urban drainage catchments. [USQ Project]
Verrall, Daniel Graham (2016) Modelling water allocation increases using climate predictions. [USQ Project]
Tunnah, Patrick (2015) Diversion of stormwater first flush: an alternative method of managing pollution to urban waterways. [USQ Project]
Jessup, Cameron (2015) Launceston’s Combined Sewerage System – investigation and strategy development. [USQ Project]
Tomasel, Aden (2014) The energy storage potential of a hybrid renewable generation grid connected to a pumped hydro-generation plant for effective connection into the energy market, off peak switchable developing load demand market and act as ancillary regional voltage support and bulk water supply. [USQ Project]
Blyth, Mitchell (2014) Investigation into sub five minute time of concentration in urban drainage design. [USQ Project]
Darton, Alex (2014) Quantification of the measurement error associated with in situ measurements of water absorption and attenuation using the AC-9 instrument. [USQ Project]
Atkinson, Jack Allan (2014) Dam deformation surveys with modern technology. [USQ Project]
Guse, Hayden Alexander (2014) Great artesian basin (GAB) water cooling systems for municipal supplies. [USQ Project]
Makireddi, Surya (2014) Groundwater recharge prediction for broad scale irrigation modelling: a case study in the M.I.A-main canal irrigated areas. [USQ Project]
Makireddi, Surya (2014) Groundwater recharge prediction for broadscale irrigation modelling: a case study in MIA-Main Canal irrigated areas. [USQ Project]
Norman, Grant (2014) Investigations into Cambooya’s water supply pressure with respect to local contributing bores. [USQ Project]
Williams, Wesley James (2014) Numerical simulations of water surfaces for improved evaporation prediction. [USQ Project]
Manthey, Byron (2014) Pre–treatment of coal seam gas produced water. [USQ Project]
Horan, Darryl (2013) Comparison of a traditional and a distributed storage water supply network for an isolated system. [USQ Project]
Johnson, Peter (2013) Comparison of direct rainfall and lumped-conceptual rainfall runoff routing methods in tropical North Queensland – a case study of Low Drain, Mount Low, Townsville. [USQ Project]
Crawford, Peter Alexander (2013) Improving surfing conditions in conjunction with coastal erosion protection. [USQ Project]
Blyth, James Ian (2013) Optimising earth dam design in seasonal freeze-thaw climates. [USQ Project]
Smith, Wesley (2013) The role of private enterprise in transforming the water, sanitation and hygiene sector in rural sub-Saharan Africa. [USQ Project]
Gaffney, Allister Henry (2013) Water sensitive urban design for the Spring Creek catchment and MUSIC sensitivity analysis. [USQ Project]
Greig, Edward Stephen (2013) Numerical simulation of water waves in reservoirs affecting evaporation. [USQ Project]
Black, Gerard Wiiliam (2012) The investigation of the sustainability of a regional approach to Water Sensitive Urban Design using a Triple Bottom Line Assessment. [USQ Project]
Turnbull, Jon (2011) Improving the performance of the Nanango wastewater treatment plant. [USQ Project]
Ryan, Richard (2011) Optimisation of flow through a horizontal spiral baffled filter. [USQ Project]
Rowlings, David Selwyn (2010) An experimental and theoretical investigation of side weirs. [USQ Project]
Skipworth, Julian (2010) An investigation and quantitative analysis of the impacts on stream flow and fluvial erosion associated with urbanisation of a small catchment. [USQ Project]
Fahey, Lawrence John (2010) Decision support system for assessing the benefits of incorporating swabbing facilities into water pipelines. [USQ Project]
Gould, Adam Mark (2010) Finite volume solution of the unsteady free surface flow equations. [USQ Project]
Elphinstone, Aaron Daniel (2010) Optimisation of pigging infrastructure in design. [USQ Project]
Dakers, Nicole (2009) A cost benefit analysis of rural residential water supply – constant flow vs. full pressure. [USQ Project]
Shears, Steven Edward (2009) Investigation of life cycle management of electromagnetic flow meters. [USQ Project]
Taylor, Oliver John (2009) Market segmentation for improved efficiency of Ipswich water supply system. [USQ Project]
Dann, Jeffrey Michael (2009) Modernisation of an existing irrigation area. [USQ Project]
Boskovic, Selina (2008) Bioretention basin best practice design guidelines. [USQ Project]
Alanne, Glen (2008) Developing a model to predict water main failures. [USQ Project]
Donohue, Rachael Michelle (2008) Inspiring high precision dam water depth measurement with novel 'bubbler’ designs. [USQ Project]
Rohde, Craig (2008) Preliminary water balance models of the Daly river catchment. [USQ Project]
Shellshear, Michael Stuart (2008) Urban stormwater treatment using chitosan. [USQ Project]
Watt, Andrew Thomas (2008) Validation of cooling grid model and testing of alternatives. [USQ Project]
de Leeuw, Gert Johannes Schreuder (2007) Analysis of hydraulic transients in pipeline networks. [USQ Project]
Martin, Christopher (2007) Ipswich City Council water supply infrastructure capacity high water usage and water meter accuracy. [USQ Project]
Saunders, Joseph Ian (2007) Porous weirs for flood mitigation. [USQ Project]
Lefhoko, Mmitsi (2007) Power station operations Millmerran power station feed water dissolved oxygen control. [USQ Project]
Weston, Bill Thomas (2007) Design and trial of an alternative option for suburban sewerage pump stations. [USQ Project]
Chan, Siew-Yuen (2006) Water leakage detection circuit in external chiller unit. [USQ Project]
Hooper, James Andrew (2006) Analysis of catchment G in Oakey's sewer network. [USQ Project]
Millikan, Toby (2006) Current and future capacity of the Wirraglen Scout Reserve Wetlands to improve urban stormwater quality at Highfields. [USQ Project]
Tinning, Eugene (2006) Field deployable shower unit by dual membrane filtration. [USQ Project]
Eastaugh, Christopher S. (2006) Forest road decommissioning: modelling the effect on hydrological connectivity. [USQ Project]
Morris, Anthony Brian (2006) Stormwater harvest and reuse for a wholesale nursery. [USQ Project]
Johnston, Kristine Leigh (2006) Treatment of mine water with colloidal suspensions. [USQ Project]
Wallace, Darren James (2006) Water and wastewater strategic township plan Warragul, Victoria. [USQ Project]
Massaro, Aaron (2006) The effect of water ratio on the mechanical properties of refactory materials. [USQ Project]
Campbell, Nicholas (2005) Analysing the effect of speed variation on irrigation efficiency in travelling irrigators. [USQ Project]
Babin, Robyn E. (2005) Assessment of factors influencing water reuse opportunities in Western Australia. [USQ Project]
Al-Busaidi, Ibrahim A. (2005) Economics of photovoltaic water pumping system in Sultanate of Oman. [USQ Project]
Le, Minh N. (2005) Investigation on reuse potential of laundry water for household garden irrigation in Toowoomba. [USQ Project]
Harrison, Rodney James (2005) Modelling Tamworth regional council stormwater network. [USQ Project]
Crouch, Glen (2005) Rationalisation of wastewater treatment plants in Launceston. [USQ Project]
Welsh, Trevor James (2005) Reverse osmosis water purification unit: for government and non-government use in disaster relief. [USQ Project]
Law, Bee Bee (2005) The usage of domestic water filtration systems in Malaysia. [USQ Project]
Wiltshire, Mark (2005) Greywater reuse in urban areas. [USQ Project]
Lau, Chau Chin (2004) A study on concrete faced rockfill dams. [USQ Project]