Lim, Chun Hao (2005) Replacement of chiller system of a terminal building. [USQ Project]
|
PDF
Project_Dissertation_D1033565X.pdf Download (2MB) |
Abstract
The air conditioning system of terminal building has deteriorated over the past 13 years. The system has caused some problems and breakdown. The owner of the terminal has engaged us to study the existing chiller system and propose a new system configuration. The new system should provide better efficiency and easy system control. In the past 10 years, chillers technology and efficiency has improved significantly. Since chiller system is probably the largest electrical consumer of a building, the operating cost of the terminal will significantly reduce.
Statistics for this ePrint Item |
Item Type: | USQ Project |
---|---|
Refereed: | No |
Item Status: | Live Archive |
Faculty/School / Institute/Centre: | Historic - Faculty of Engineering and Surveying - Department of Mechanical and Mechatronic Engineering (Up to 30 Jun 2013) |
Date Deposited: | 11 Oct 2007 00:12 |
Last Modified: | 02 Jul 2013 22:30 |
Uncontrolled Keywords: | air conditioning, chiller system design |
Fields of Research (2008): | 09 Engineering > 0913 Mechanical Engineering > 091399 Mechanical Engineering not elsewhere classified |
Fields of Research (2020): | 40 ENGINEERING > 4017 Mechanical engineering > 401799 Mechanical engineering not elsewhere classified |
URI: | https://sear.unisq.edu.au/id/eprint/31 |
Actions (login required)
Archive Repository Staff Only |