Replacement of chiller system of a terminal building

Lim, Chun Hao (2005) Replacement of chiller system of a terminal building. [USQ Project]

[img]
Preview
PDF
Project_Dissertation_D1033565X.pdf

Download (2MB)

Abstract

The air conditioning system of terminal building has deteriorated over the past 13 years. The system has caused some problems and breakdown. The owner of the terminal has engaged us to study the existing chiller system and propose a new system configuration. The new system should provide better efficiency and easy system control. In the past 10 years, chillers technology and efficiency has improved significantly. Since chiller system is probably the largest electrical consumer of a building, the operating cost of the terminal will significantly reduce.


Statistics for USQ ePrint 31
Statistics for this ePrint Item
Item Type: USQ Project
Refereed: No
Item Status: Live Archive
Faculty/School / Institute/Centre: Historic - Faculty of Engineering and Surveying - Department of Mechanical and Mechatronic Engineering (Up to 30 Jun 2013)
Date Deposited: 11 Oct 2007 00:12
Last Modified: 02 Jul 2013 22:30
Uncontrolled Keywords: air conditioning, chiller system design
Fields of Research (2008): 09 Engineering > 0913 Mechanical Engineering > 091399 Mechanical Engineering not elsewhere classified
Fields of Research (2020): 40 ENGINEERING > 4017 Mechanical engineering > 401799 Mechanical engineering not elsewhere classified
URI: https://sear.unisq.edu.au/id/eprint/31

Actions (login required)

View Item Archive Repository Staff Only